Skip to main content
Artificial turf sample swatches angled side by side showing different pile heights and textures.

Artificial Turf

Fourteen premium turf lines for lawns, pets, putting greens, and play areas — shipped on 12ft or 15ft wide × 100ft rolls, depending on the SKU.

Showing 14 turf products

Compare specs side by side

Turf products

Photo coming soon

Landscape turf

Seasonal special, ask your rep

Power 83

Pile height
1.77 in
Face weight
83 oz/sq yd
Roll size
15 ft x 100 ft
Photo coming soon

Pet turf

K9 70Pet

Pile height
1.26 in
Face weight
70 oz/sq yd
Roll size
15 ft x 100 ft

Superior Turf Direct supplies materials only and does not install. We are not licensed as contractors in California, Nevada, or Arizona, and we do not hold ourselves out as contractors in any state. Installation must be performed by an appropriately licensed contractor where the law requires one. cslb.ca.gov

Installed performance depends on base preparation, compaction, drainage design, seaming, fastening, infill selection where applicable, site conditions, subsurface drainage, traffic, weather, and maintenance — none of which is supplied or controlled by Superior. Read the full disclaimer.

Trade planning notes

What should a contractor confirm before ordering turf?

By Superior Turf Direct — materials team · Last updated

  1. Inspect the site before specifying the roll: existing soil, low spots, tree roots, irrigation serving retained plants, and the proposed drainage outlet.
  2. Have the installer define excavation, aggregate selection, grading and compaction for the actual soil and intended use. A permeable backing cannot correct a blocked outlet or a poorly prepared base.
  3. Lay out the roll direction and seams on a measured plan before ordering. Keep adjoining pieces oriented consistently and account for curves, obstacles and offcuts rather than buying only the finished surface area.
  4. Confirm infill type and application quantity for the selected turf and use. Bag weight is not a universal coverage specification. Keep product warnings and handling instructions with the crew.
  5. At handover, record the turf line and lot, drainage route, seam locations and maintenance responsibilities. Retain material documents for future repairs and warranty questions.
Artificial turf sample swatches angled side by side showing different pile heights and textures.
Material and application reference image — not a claimed Superior installation.

Which specification answers which buying question?

CheckUseful forStill confirm
Pile height and face weightComparing the stated fiber constructionTexture in a physical sample, intended use and the complete specification
Roll layoutPlanning joins and material quantitiesGrain direction, trim allowance and access to the site
Infill and backingPlanning the complete surface assemblySite drainage, maintenance and application-specific requirements

What maintenance should be planned from day one?

Assign a regular debris inspection and removal routine. In pet areas, remove solid waste promptly and plan rinsing with an available water source and a working drain. Inspect seams, edges and displaced infill after heavy use or storms; brush and replenish only according to the selected product instructions. Set the frequency to actual traffic, nearby trees and site conditions rather than promising a maintenance-free surface.

How do heat and water use affect the specification?

Synthetic turf can become hot in direct sun. Plan shade, surface-temperature checks and the timing of pet or play use; do not assume the surface stays cool because it looks green. Replacing an irrigated lawn changes watering needs, but trees and retained plants still need an irrigation plan, and cleaning can require water. No project-specific reduction is promised without a measured baseline.

These are material-planning checkpoints for independent contractors, not a site design or an installation service. Confirm construction requirements with the project designer and the installer.

Discuss material specifications: (619) 717-1342
Sources and project references